Materi Safety : HOT WORK PERMIT
KATA KUNCI
• Flammable gas monitoring
• Tank Isolation
• Hot work permits, procedures, and sign-offs
Contoh kasus kecelakaan kerja :
Flammable Vapor Explosion
Welding on Tank Containing Vinyl Fluoride (1 Killed, 1 injured)
November 9, 2010
Di Perusahaan DuPont de Nemours & Co Inc., Buffalo, New York
RINGKASAN KRONOLOGIS KECELAKAAN
This case study examines a November 9, 2010,
explosion at an E.I. duPont de Nemours and Co.
Inc., Yerkes chemical plant in Buffalo, New York
when a contract welder and foreman were repairing
the agitator support atop an atmospheric storage
tank containing flammable vinyl fluoride. The
welder died instantly from blunt force trauma,
and the foreman received first-degree burns and
minor injuries. The explosion blew most of the
top off the tank. The top and agitator assembly
hung over the side of the tank supported only
by a 2-foot section of the top (cover photo). The
explosion caused minor overpressure damage in
the tank farm area and the adjacent production
building.
The U.S. Chemical Safety Board (CSB) determined
that flammable vinyl fluoride (VF) vapor
from interconnected, in-service process tanks flowed undetected into the tank and ignited
when the welder was repairing the agitator support assembly. In February 2010, the CSB
issued a “Hot Work Safety Bulletin” that summarized 11 similar fatal incidents. Like the
incidents described in the bulletin, this was another example of improperly monitored hot
work activities involving flammable conditions inside a container.
KEY FINDINGS
1. DuPont PHAs made the incorrect assumption that VF in the Tedlar process could not
reach flammable levels in the slurry tanks.
2. DuPont restarted the unit after incorrectly concluding that the defective seal loop did
not increase the risk of VF vapor transfer into tank 2. Flammable VF vapor flowed
directly from the flash tank into tank 2.
3. DuPont did not properly isolate and lockout tank 1 from in-service tanks 2 and 3 prior
to authorizing hot work on tank 1. Consequently, flammable VF vapor passed directly
from tank 2 into tank 1 through the overflow line and accumulated to a concentration
above the lower explosive limit.
4. The DuPont hot work permit procedure did not require testing the atmosphere inside
tank 1 for flammable vapor even though the work required welding directly to the tank
top.
5. The individuals who signed off on the hot work permit were not knowledgeable in the
operations and hazards of the Tedlar process.
6. The repair work created multiple ignition sources. Welding directly to the tank top
increased the metal temperature inside the tank significantly above the VF vapor autoignition
temperature. Welding and grinding generated hot sparks, which likely ignited the
flammable vapor.
7. OSHA’s hot work standard does not specifically require gas monitoring inside containers
intended for hot work even though it is recommended by industry safe practice
guidelines.
LESSONS LEARNED
1. Welding to the outside surface of a tank or container generates heat and sparks near the
weld area. The extreme temperatures and sparks will likely ignite flammable materials
present inside the equipment.
2. Before starting hot work activities, all process connections on tanks and similar containers
should be completely isolated by closing valves, installing blanks, and disconnecting
pipes to ensure that all possible and known sources of flammable materials
cannot enter the container at any time.
3. The atmosphere inside any container previously containing flammables, regardless of
size, should be tested before authorizing any hot work involving grinding, cutting, or
welding on the outside surface and the atmosphere must be continuously monitored
during the work.
Laporan lengkapnya dapat dilihat pada link berikut ini :
Chemical Safety Board Site
KATA KUNCI
• Flammable gas monitoring
• Tank Isolation
• Hot work permits, procedures, and sign-offs
Contoh kasus kecelakaan kerja :
Flammable Vapor Explosion
Welding on Tank Containing Vinyl Fluoride (1 Killed, 1 injured)
November 9, 2010
Di Perusahaan DuPont de Nemours & Co Inc., Buffalo, New York
RINGKASAN KRONOLOGIS KECELAKAAN
This case study examines a November 9, 2010,
explosion at an E.I. duPont de Nemours and Co.
Inc., Yerkes chemical plant in Buffalo, New York
when a contract welder and foreman were repairing
the agitator support atop an atmospheric storage
tank containing flammable vinyl fluoride. The
welder died instantly from blunt force trauma,
and the foreman received first-degree burns and
minor injuries. The explosion blew most of the
top off the tank. The top and agitator assembly
hung over the side of the tank supported only
by a 2-foot section of the top (cover photo). The
explosion caused minor overpressure damage in
the tank farm area and the adjacent production
building.
The U.S. Chemical Safety Board (CSB) determined
that flammable vinyl fluoride (VF) vapor
from interconnected, in-service process tanks flowed undetected into the tank and ignited
when the welder was repairing the agitator support assembly. In February 2010, the CSB
issued a “Hot Work Safety Bulletin” that summarized 11 similar fatal incidents. Like the
incidents described in the bulletin, this was another example of improperly monitored hot
work activities involving flammable conditions inside a container.
KEY FINDINGS
1. DuPont PHAs made the incorrect assumption that VF in the Tedlar process could not
reach flammable levels in the slurry tanks.
2. DuPont restarted the unit after incorrectly concluding that the defective seal loop did
not increase the risk of VF vapor transfer into tank 2. Flammable VF vapor flowed
directly from the flash tank into tank 2.
3. DuPont did not properly isolate and lockout tank 1 from in-service tanks 2 and 3 prior
to authorizing hot work on tank 1. Consequently, flammable VF vapor passed directly
from tank 2 into tank 1 through the overflow line and accumulated to a concentration
above the lower explosive limit.
4. The DuPont hot work permit procedure did not require testing the atmosphere inside
tank 1 for flammable vapor even though the work required welding directly to the tank
top.
5. The individuals who signed off on the hot work permit were not knowledgeable in the
operations and hazards of the Tedlar process.
6. The repair work created multiple ignition sources. Welding directly to the tank top
increased the metal temperature inside the tank significantly above the VF vapor autoignition
temperature. Welding and grinding generated hot sparks, which likely ignited the
flammable vapor.
7. OSHA’s hot work standard does not specifically require gas monitoring inside containers
intended for hot work even though it is recommended by industry safe practice
guidelines.
LESSONS LEARNED
1. Welding to the outside surface of a tank or container generates heat and sparks near the
weld area. The extreme temperatures and sparks will likely ignite flammable materials
present inside the equipment.
2. Before starting hot work activities, all process connections on tanks and similar containers
should be completely isolated by closing valves, installing blanks, and disconnecting
pipes to ensure that all possible and known sources of flammable materials
cannot enter the container at any time.
3. The atmosphere inside any container previously containing flammables, regardless of
size, should be tested before authorizing any hot work involving grinding, cutting, or
welding on the outside surface and the atmosphere must be continuously monitored
during the work.
Laporan lengkapnya dapat dilihat pada link berikut ini :
Chemical Safety Board Site
Jumat, 27 Agustus 2010
Pengumuman Penerima Beasiswa (part I)
Berikut ini kami sampaikan hasil sementara untuk calon mahasiswa yang dinyatakan lulus dalam proses seleksi penerimaan beasiswa Program Pendidikan dan Pelatihan Teknisi Industri Kimia angkatan XIII.
Hasil ini bersifat sementara, karena beberapa calon penerima beasiswa lainnya masih dalam proses. Diharapkan minggu depan sudah diperoleh semua hasilnya.
Bagi yang namanya tercantum dibawah ini, diwajibkan untuk datang ke kampus guna mendapatkan pengarahan dari Program.
Hasil ini bersifat sementara, karena beberapa calon penerima beasiswa lainnya masih dalam proses. Diharapkan minggu depan sudah diperoleh semua hasilnya.
Bagi yang namanya tercantum dibawah ini, diwajibkan untuk datang ke kampus guna mendapatkan pengarahan dari Program.
No | P/L | NAMA | No. UJIAN | SPONSOR | Ds./Kec |
1 | P | Babay Sholehah | 021 | ALINDO | Serang |
2 | P | Dewi Astuti | 128 | AMI | Rawa Arum |
3 | L | Nurul Hidayat | 049 | AMI | Rawa Arum |
4 | P | Anita Rusmita | 113 | API | Rawa Arum |
5 | P | Eka Pratiwi | 179 | ASC | Anyer |
6 | L | Imam Fauzi | 107 | ASC | Anyer |
7 | L | Mamduch | 170 | BMSI | Anyer |
8 | L | Aryan Desyanto | 169 | BMSI | Anyer |
9 | L | Jayadi Wiropo | 235 | BSI | Jombang |
10 | BSI | ||||
11 | L | Adha Priyawan | 258 | KS | Serang |
12 | P | Lia Wuriyanti | 209 | KS | Bojonegara |
13 | L | Ali Fatma | 074 | KS | Ciwandan |
14 | L | Dikky Ramadoni | 033 | KS | Anyer |
15 | P | Syakhshiyyatul Mar'ah | 142 | KS | Pulomerak |
16 | P | Ida Samsidar Aprianti | 137 | KS | Cinangka |
17 | L | Ahmad Roji | 138 | KS | Ciwandan |
18 | P | Bai Fuadiyah | 044 | KS | Mancak |
19 | L | Irfan Hilmi | 072 | KS | Mancak |
20 | L | Hikmatullah | 080 | KS | Ciwandan |
21 | L | Asep Gunawan | 082 | KS | Mancak |
22 | L | Agung Nugroho | 140 | KS | Purwakarta |
23 | L | Asep Aziz Naziri | 077 | KS | Anyer |
24 | P | Istiyanah | 256 | KS | Citangkil |
25 | P | Iyus Novianti | 265 | KS | Jombang |
26 | L | Muhammad Hoironi | 022 | KS | PuloAmpel |
27 | L | Takiyudin | 037 | KS | Bojonegara |
28 | L | Abdul Rosid | 131 | KS | Bojonegara |
29 | L | Rohayuli | 274 | KS | Purwakarta |
30 | KS | ||||
31 | L | Fariz Al-Anshori | 176 | LATINUSA | Citangkil |
32 | L | Dimas Junaedi | 067 | MCCI | Waringin Kurung |
33 | L | Lutfi | 226 | MCCI | Purwakarta |
34 | P | Juwitta Vita Sari | 143 | NB | Jombang |
35 | L | Azri Prihatna | 175 | POLYCHEM | PuloAmpel |
36 | L | Nur Trisno | 076 | STA | Serang |
37 | P | Asmariyah | 116 | UIC | Gerem |
Jumat, 13 Agustus 2010
JADWAL INTERVIEW
1 | PT. Asahimas Chemical | ||
Hari/Tanggal | : Rabu, 18 Agustus 2010 | ||
Jam | : 09.00 WIB | ||
Tempat | : PT Asahimas Chemical | ||
: Jl. Raya Anyer Km 122 - Ciwandan - Anyer | |||
Kontak Person | : Bp. Rusman Zainal Abidin | ||
2 | PT. Air Liquide Indonesia | ||
Hari/Tanggal | : Kamis, 19 Agustus 2010 | ||
Jam | : 13.30 WIB | ||
Tempat | : PT Air Liquid Indonesia | ||
: Kawasan Industri KIEC - Cilegon | |||
Kontak Person | : Bp. Rully Roliyanto | ||
3 | PT. Air Product Indonesia | ||
Hari/Tanggal | : Senin, 16 Agustus 2010 | ||
Jam | : 08.00 WIB | ||
Keperluan | : Mengambil Surat Pengantar Medical di PT API | ||
Tempat | : PT API | ||
Jl. Raya Merak km 116 - Rawa Arum | |||
Hari/Tanggal | : Kamis, 19 Agustus 2010 | ||
Jam | : 09.00 WIB | ||
Keperluan | : Interview | ||
Tempat | : PT API | ||
Jl. Raya Merak km 116 - Rawa Arum | |||
Kontak Person | : Bp. Agus Setiyanto | ||
4 | PT. Cabot Indonesia | ||
Hari/Tanggal | : Rabu, 18 Agustus 2010 | ||
Jam | : 14.00 WIB | ||
Tempat | : PT CABOT ( Plant Cilegon ) | ||
Kawasan Industri KIEC | |||
Kontak Person | : Bp. Darmawi | ||
5 | PT.Nippon Shokubai Indonesia | ||
Hari/Tanggal | : Jumat , 13 Agustus 2010 | ||
Jam | : 13,30 WIB | ||
Tempat | : PT Nippon Shokubai Indonesia | ||
Kontak Person | Bp. Sobri | ||
6 | PT. Styron Indonesia | ||
Hari/Tanggal | : Rabu, 18 Agustus 2010 | ||
Jam | : 10.00 WIB | ||
Tempat | : FT UNTIRTA | ||
: Jl. Raya Merak Km 3 | |||
Kontak Person | : Bp. Erriawan | ||
7 | PT. Latinusa | ||
Hari/Tanggal | : Rabu, 18 Agustus 2010 | ||
Jam | : 9.00 WIB | ||
Tempat | : R.Rapat Divisi Human Capital Managemen (HRD) | ||
PT Latinusa | |||
Kontak Person | : Bp. Siswanto | ||
8 | PT. Mitsubishi Chemical Indonesia | ||
Hari/Tanggal | : Rabu, 18 Agustus 2010 | ||
Jam | : 13.30 WIB | ||
Tempat | : PT Mitsuibishi Chemical Indonesia | ||
Jl. Raya Merak Ds. Gerem - Kec. Grogol | |||
Kontak Person | : Bp. Tommy Rahmatullah | ||
9 | PEMDA CILEGON | ||
Hari/Tanggal | : Rabu (18 Agustus 2010) dan Kamis (19 Agustus 2010) | ||
Jam | : 08.00 WIB | ||
Tempat | : Dinas Pendidikan Cilegon | ||
Jl. Kepodang No. 13 & 14 Kav. Blok F | |||
Pagebangan, Cilegon | |||
Kontak Person | : Bp. Wira | ||
10 | PT. Polychem Lindo | ||
Hari/Tanggal | : Kamis, 19 Agustus 2010 | ||
Jam | : 09.00 WIB | ||
Tempat | : PT Polychem Lindo | ||
Kontak Person | : Bp. Marthin Mantiri | ||
11 | PT. Sarana Teknik Abadi | ||
Hari/Tanggal | : Rabu, 18 Agustus 2010 | ||
Jam | : 09.00 WIB | ||
Tempat | : PT Sarana Teknik Abadi | ||
Jl. Raya - Serang | |||
Kontak Person | : Ibu Ati | ||
12 | PT. Unggul Indah Cahaya Tbk | ||
Hari/Tanggal | : Senin, 16 Agustus 2010 | ||
Jam | : 09.30 WIB | ||
Tempat | : PT Unggul Indah Cahaya Tbk. | ||
Jl. Raya Merak Km 116 - Gerem | |||
Kontak Person | : Bp. Muhammad Supriyono | ||
13 | PT. Blue ScopeSteel Indonesia | ||
Hari/Tanggal | : Senin, 16 Agustus 2010 | ||
Jam | : 14.00 WIB | ||
Tempat | : PT Blue ScopeSteel Indonesia | ||
Kawasan Industri KIEC | |||
Kontak Person | : Bp. Aries | ||
Keterangan | |||
Jika ada hal-hal yang tidak jelas dapat ditanyakan di sekretariat PPPTIK Sebelum Interview di Industri SPONSOR, peserta wajib mengikuti TES BUTA WARNA yang dilakukan di sekretariat PPPTIK, pada jam kerja (sebelum interview) |
PENGUMUMAN HASIL TEST AKADEMIK P3TIK DAN TEMPAT INTERVIEW
No | P/L | NAMA | No. UJIAN | TEMPAT INTERVIEW | Ds./Kec |
1 | L | Jordan Prasetya | 013 | ALINDO | Tangerang |
2 | P | Babay Sholehah | 021 | ALINDO | Serang |
3 | L | Dede Nurul Iman | 091 | ALINDO | Anyer |
4 | L | Syahrizal Fahlevi | 086 | AMI | PuloMerak |
5 | P | Dewi Astuti | 128 | AMI | Rawa Arum |
6 | P | Lika Mauliddiah | 144 | AMI | Rawa Arum |
7 | L | Nurul Hidayat | 049 | AMI | Rawa Arum |
8 | P | Ina Musarofah | 129 | AMI | Rawa Arum |
9 | L | Muhamad Hardi Alim | 068 | AMI | Rawa Arum |
10 | P | Anita Rusmita | 113 | API | Rawa Arum |
11 | P | Rosalia | 112 | API | Rawa Arum |
12 | P | Eka Pratiwi | 179 | ASC | Anyer |
13 | L | Muntasir | 155 | ASC | Anyer |
14 | L | Imam Fauzi | 107 | ASC | Anyer |
15 | P | Vita Fatihatur Rizqiyah | 204 | ASC | Mancak |
16 | L | Mamduch | 170 | BMSI | Anyer |
17 | L | Aryan Desyanto | 169 | BMSI | Anyer |
18 | L | Suherman | 152 | BSI | Bojonegara |
19 | L | Jayadi Wiropo | 235 | BSI | Jombang |
20 | P | Indri Dwi Erfianti | 012 | CABOT | Tangerang |
21 | L | Muhammad Ichwan Zahid | 271 | CABOT | Tangerang |
22 | P | Malinda | 085 | CABOT | Bojonegara |
23 | L | Riki Manggala Utama | 102 | CABOT | Citangkil |
24 | L | Adi Wiyono | 038 | CLARIANT | Tangerang |
25 | P | Ratu Iva Rizkiyah | 018 | CLARIANT | Serang |
26 | P | Miftahul Janah | 136 | CLARIANT | Citangkil |
27 | L | Setiawan | 132 | CLARIANT | Citangkil |
28 | L | Adha Priyawan | 258 | KS | Serang |
29 | P | Lia Wuriyanti | 209 | KS | Bojonegara |
No | P/L | NAMA | No. UJIAN | TEMPAT INTERVIEW | Ds./Kec |
30 | L | Ali Fatma | 074 | KS | Ciwandan |
31 | L | Dikky Ramadoni | 033 | KS | Anyer |
32 | P | Syakhshiyyatul Mar'ah | 142 | KS | Pulomerak |
33 | P | Ida Samsidar Aprianti | 137 | KS | Cinangka |
34 | L | Ahmad Roji | 138 | KS | Ciwandan |
35 | P | Bai Fuadiyah | 044 | KS | Mancak |
36 | L | Irfan Hilmi | 072 | KS | Mancak |
37 | L | Hikmatullah | 080 | KS | Ciwandan |
38 | L | Asep Gunawan | 082 | KS | Mancak |
39 | L | Agung Nugroho | 140 | KS | Purwakarta |
40 | L | Asep Aziz Naziri | 077 | KS | Anyer |
41 | P | Istiyanah | 256 | KS | Citangkil |
42 | P | Iyus Novianti | 265 | KS | Jombang |
43 | L | Muhammad Hoironi | 022 | KS | PuloAmpel |
44 | L | Ahmad Rizki Virdaus | 064 | KS | Bojonegara |
45 | P | Mela Fikriyana | 194 | KS | PuloAmpel |
46 | L | Takiyudin | 037 | KS | Bojonegara |
47 | L | Abdul Rosid | 131 | KS | Bojonegara |
48 | L | Rohayuli | 274 | KS | Purwakarta |
49 | L | Fariz Al-Anshori | 176 | LATINUSA | Citangkil |
50 | L | Rukyatullah | 008 | LATINUSA | Citangkil |
51 | L | M. Irfan Ismail | 165 | MCCI | Serang |
52 | L | Dimas Junaedi | 067 | MCCI | Waringin Kurung |
53 | L | Lutfi | 226 | MCCI | Purwakarta |
54 | L | Novan Adriansyah | 150 | MCCI | Cibeber |
55 | L | Rudini Koto | 160 | MCCI | Purwakarta |
56 | L | Bondan Sudianto | 032 | MCCI | Citangkil |
57 | P | Juwitta Vita Sari | 143 | NB | Jombang |
58 | L | Maman Abdurrohman | 029 | NSI | PuloAmpel |
59 | L | Ekky Prasetya | 234 | NSI | Jombang |
60 | L | Ferry Cahya Purnama | 004 | NSI | Cilegon |
61 | L | Mulya Rizki | 096 | NSI | Jombang |
No | P/L | NAMA | No. UJIAN | TEMPAT INTERVIEW | Ds./Kec |
62 | L | Ahmad Miftahul | 187 | PEMDA | Ciwandan |
63 | L | Rio Novrianto | 062 | PEMDA | Cibeber |
64 | L | Alim Zaini | 178 | PEMDA | Citangkil |
65 | P | Hayatun Nufus | 071 | PEMDA | Jombang |
66 | L | Asro Laila | 186 | PEMDA | Ciwandan |
67 | L | Gery Uhono | 182 | PEMDA | Jombang |
68 | P | Dewi Ambarwati | 205 | PEMDA | Citangkil |
69 | P | Eni Eviyani | 101 | PEMDA | Citangkil |
70 | L | Bayu Sobirin | 158 | PEMDA | Citangkil |
71 | L | Mahmudin | 212 | PEMDA | Citangkil |
72 | L | Nasrullah | 104 | PEMDA | Citangkil |
73 | L | Afra | 027 | PEMDA | Cilegon |
74 | P | Uniyati | 195 | POLYCHEM | PuloAmpel |
75 | L | Azri Prihatna | 175 | POLYCHEM | PuloAmpel |
76 | L | Andri Rulandi | 200 | SNMPTN | Tangerang |
77 | L | Laksamana Mujaddid Ulinnuha | 207 | STA | Serang |
78 | L | Nur Trisno | 076 | STA | Serang |
79 | P | Ani Hardiyanti | 130 | STYRON | Bojonegara |
80 | P | Andini Kusuma Dewi | 252 | STYRON | Serang |
81 | P | Nurholisoh | 030 | STYRON | Bojonegara |
82 | L | Ginanjar Nur Rochman | 047 | STYRON | Cibeber |
83 | P | Nur Maela | 214 | STYRON | Pulomerak |
84 | P | Asmariyah | 116 | UIC | Gerem |